COP27 SUPPLY

COP27 SUPPLY 5 MW SOLAR POWER PLANT

 

 

  • Date: 12 April 2018
  • Factory: SIEMENS energy
  • Project Type: SOLAR POWER

About this Project

Scope :Owner Consultant

Scope of work

  • BOP system conceptual design and value engineering.
    Interconnection studies with the Electrical Authority.

    Developer

    Offtaker

    Contact Us

    Lorem ipsum dolor sit amet consectetur elit.

    +00 123 456 7893

    divi-construction@gmail.com