ABO RAWASH WASTE
35MW ABO RAWASH WASTE TO ENERGY POWER PLANT
- Date: 12 April 2018
- Client: OAK GROUP MENA
- Project Type: POWER PLANT
About this Project
Scope : Owner Consultant
Scope of work
- Optimum Techno-Economic Design for the Evacuation Network through the adjacent Substations.
- Power System Studies for inter-Connection with the Utility.